A dehumidifier cannot keep up sensibly with rainwater entering through a roof, wall or threshold. Map the water first and give a building specialist evidence tied to weather, rather than a photograph of a dry stain days later.
Start safely at ground level
Do not climb onto the roof or use a ladder in wet or windy conditions to complete this checklist. HSE says work at height should be properly planned, supervised and carried out by competent people with suitable equipment. Binoculars, ground-level photographs and a professional inspection are safer ways to investigate roof details.
Keep electrical equipment away from water. If water is near the consumer unit, sockets, charging equipment or damaged wiring, isolate only if it is safe to do so and contact a competent electrician.
Draw a simple garage map
Mark north if known, the door, walls, roof slope, downpipes, gullies, floor joints and the car position. During or immediately after rain, mark the first visible water and the edge of each patch. Add photographs with a repeated reference point.
Record:
- Rain duration, intensity and wind direction.
- Whether gutters overflow or downpipes back up.
- Water crossing beneath the garage door.
- Drips, staining or wet fixings at roof level.
- Damp bands at wall bases or cracks.
- Floor patches unrelated to the roof drip line.
- Water carried in by a recently driven car.
Do not assume the highest visible stain is the entry point; water can travel along timbers, sheets and joints.
Separate four routes
| Route | Useful evidence |
|---|---|
| From above | Timing of first drip, roof slope, wind, overhead detail |
| Through a wall | External ground level, splash, joints, cracks, adjacent drainage |
| Across the threshold | Drive slope, door seal, channel or gully behaviour |
| Through or across the slab | Patch timing, previous coatings, nearby plumbing, floor level |
Approved Documents C and H provide building-regulation guidance on resistance to moisture and drainage, but they are not a diagnosis or a DIY repair specification. The building's age, construction, location and whether work is controlled all matter.
Prepare the specialist brief
Send the map, event log and photographs before the visit. Ask the contractor to identify the probable route, how it will be confirmed, the repair boundary and what adjacent defects or drainage constraints need attention. Request before-and-after evidence and maintenance instructions.
Avoid accepting “seal the inside” as a full explanation when water continues to reach the construction. Likewise, a new floor coating should not be chosen until substrate moisture and water entry have been assessed.
Protect the car during investigation
Move the vehicle only if it is safe, insured and legal to do so. Do not trap it beneath a wet non-breathable sheet. Remove loose wet items and keep a clear path for inspection. If water could contain sewage, fuel, oil or another contaminant, prevent contact and seek appropriate help.
Log garage temperature and humidity throughout the repair but evaluate the leak by reproducing comparable rain conditions. A lower humidity reading does not prove the roof or threshold is watertight.
After the building work, update the map with repaired areas and the first successful rain check. Continue with garage floor moisture, hygrometer placement and the stored-car damp worksheet to see whether a separate air-moisture issue remains.
Sources & checks
Checked 2026-11-10. Read the original instructions before acting.